Eddy Current Tube Inspection Service Line
Overview
Gecric Integrity carried out Eddy Current Tube Inspection on critical components aboard an FPSO demonstrating unique in-country capability.
Planning
- Identified critical inspection areas within pressure systems
- Selected Eddy Current Testing for high-sensitivity defect detection
- Coordinated offshore execution schedule
Execution
- Conducted Eddy Current Tube Inspection on pressure systems
- Captured high-resolution defect data
- Ensured compliance with offshore inspection standards
Operational Challenge
- Offshore constraints and limited access
- Requirement for high precision in defect detection
- Tight operational timelines
Outcome
- Successfully identified potential defects in critical components
- Enhanced equipment reliability and safety