Overview

Gecric Integrity carried out an Alternating Current Field Measurement (ACFM) inspection on a critical gear shaft at a mining operation during a scheduled 24-hour shutdown. The objective was to detect surface-breaking defects and assess the integrity of the shaft within a limited timeframe to support safe and efficient restart of operations.

Planning

  • Pre-shutdown engagement with client maintenance and engineering teams
  • Identification of critical inspection zones on the gear shaft
  • Selection of ACFM technology for rapid, high-sensitivity crack detection without surface coating removal
  • Development of a detailed execution schedule to fit within the 24-hour shutdown window
  • Mobilization of certified NDT personnel and specialized ACFM equipment

Execution

  • Surface preparation (minimal, as required for ACFM application)
  • Deployment of ACFM probes across designated inspection areas
  • Real-time detection and sizing of surface-breaking cracks
  • Immediate data interpretation and validation by certified technicians
  • Continuous coordination with client teams to optimize shutdown time

Operational Challenge

  • Strict 24-hour shutdown window with no allowance for delays
  • Critical nature of the gear shaft to plant operations
  • Need for accurate defect detection without extensive surface preparation
  • High-pressure environment requiring rapid decision-making

Outcome

  • Completed full inspection within the 24-hour shutdown period
  • Successfully identified and characterized surface defects
  • Enabled informed maintenance decisions prior to restart
  • Prevented potential equipment failure and unplanned downtime
  • Supported safe and timely resumption of mining operations