Overview
Gecric Integrity carried out an Alternating Current Field Measurement (ACFM) inspection on a critical gear shaft at a mining operation during a scheduled 24-hour shutdown. The objective was to detect surface-breaking defects and assess the integrity of the shaft within a limited timeframe to support safe and efficient restart of operations.
Planning
- Pre-shutdown engagement with client maintenance and engineering teams
- Identification of critical inspection zones on the gear shaft
- Selection of ACFM technology for rapid, high-sensitivity crack detection without surface coating removal
- Development of a detailed execution schedule to fit within the 24-hour shutdown window
- Mobilization of certified NDT personnel and specialized ACFM equipment
Execution
- Surface preparation (minimal, as required for ACFM application)
- Deployment of ACFM probes across designated inspection areas
- Real-time detection and sizing of surface-breaking cracks
- Immediate data interpretation and validation by certified technicians
- Continuous coordination with client teams to optimize shutdown time
Operational Challenge
- Strict 24-hour shutdown window with no allowance for delays
- Critical nature of the gear shaft to plant operations
- Need for accurate defect detection without extensive surface preparation
- High-pressure environment requiring rapid decision-making
Outcome
- Completed full inspection within the 24-hour shutdown period
- Successfully identified and characterized surface defects
- Enabled informed maintenance decisions prior to restart
- Prevented potential equipment failure and unplanned downtime
- Supported safe and timely resumption of mining operations