Gecric Integrity carried out an Alternating Current Field Measurement (ACFM) inspection on a critical gear shaft at a mining operation during a scheduled 24-hour shutdown. The objective was to detect surface-breaking defects and assess the integrity of the shaft within a limited timeframe to support safe and efficient restart of operations.

ACFM inspection on a gear shaft during a 24-hour shutdown

Planning

  • Pre-shutdown engagement with client maintenance and engineering teams
  • Identification of critical inspection zones on the gear shaft
  • Selection of ACFM technology for rapid, high-sensitivity crack detection without surface coating removal
  • Development of a detailed execution schedule to fit within the 24-hour shutdown window
  • Mobilization of certified NDT personnel and specialized ACFM equipment

Execution

  • Surface preparation (minimal, as required for ACFM application)
  • Deployment of ACFM probes across designated inspection areas
  • Real-time detection and sizing of surface-breaking cracks
  • Immediate data interpretation and validation by certified technicians
  • Continuous coordination with client teams to optimize shutdown time

Operational Challenge

  • Strict 24-hour shutdown window with no allowance for delays
  • Critical nature of the gear shaft to plant operations
  • Need for accurate defect detection without extensive surface preparation
  • High-pressure environment requiring rapid decision-making

Outcome

  • Completed full inspection within the 24-hour shutdown period
  • Successfully identified and characterized surface defects
  • Enabled informed maintenance decisions prior to restart
  • Prevented potential equipment failure and unplanned downtime
  • Supported safe and timely resumption of mining operations

How We Work

ACFM inspection on a gear shaft during a 24-hour shutdown

Project case study pdf

Download the PDF of this project case study here.

Related Service

ACFM inspection on a gear shaft during a 24-hour shutdown
Alternating Current Field Measurement (ACFM)
Alternating Current Field Measurement (ACFM)
Learn More

We're Here To Help

Got Questions? Our team is happy to answer all your technical questions. Please call us any time.